Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Huaian Bolong Waterproof Material Co., Ltd.

JS waterproof coating, K11 waterproof coating, acrylic waterproof coating, ce...

sell
  • There is no classification
contact
  • Contact:陶伟
  • Phone:0517-80505866
search
 
link
  • There is no link yet
home > sell > Bolong plugging king
Bolong plugging king
products: Views:12Bolong plugging king 
brand: 博隆
产地: 江苏
price: 50.00元/箱
MOQ: 1 箱
Total supply: 9999 箱
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-03-12 08:56
 
Details
Introduction to Leak Stopping King: Leak Stopping King refers to a high-performance, latest high-tech product that integrates inorganic, alkali-free, waterproof, moisture-proof, anti-cracking, anti-seepage, and leak-stopping features. Its most amazing
characteristics Yes: it solidifies quickly and has a density and strength much higher than the current high-grade concrete! It starts to solidify one minute after mixing, and finally solidifies in three to four minutes. The compressive strength can reach the above in one day. It can also be used on wet base surfaces. Construction can be carried out directly on the ground. It is used for emergency rescue, road restoration, etc. It can be restored to its original state in one hour and can be opened to traffic in four hours. It is used for waterproofing projects. With water and pressure, the leakage will stop immediately. This product is easy to operate and can be used by just adding water to mix it. , non-toxic, harmless and pollution-free. Portland cement can be added to adjust the retarding time. It has the same lifespan as the building.
Scope of application:
Non-scalable concrete or mortar structures such as kitchens and bathrooms, basements, roofs, etc. It can strengthen the waterproofing of the arcs of internal corners and around pipes, as well as various wall pipes. It has excellent results in repairing defects around the casing and internal corners. It can also be used to bury hooks, seal equipment railings, etc.
Main features:
This product has the function of quickly plugging water with water. The initial setting time is only two minutes and the final setting time is fifteen minutes.
This product can be applied on both the front and back surfaces, and is combined with the base layer to form a non-aging whole, with extremely strong water resistance.
. The solidification time of this product can be adjusted arbitrarily according to user needs. Waterproofing and bonding are completed in one go, and the bonding force is strong.
This product has no corrosion to steel bars.
This product is non-toxic, odorless, environmentally friendly, non-flammable and can be used in drinking water projects.
Trial scope:
, Roofing: concrete flat, sloping roofs, gutters, awnings and various irregular-shaped roofs
Underground construction: concrete interior walls, exterior walls, ground, Elevator pits, underground tunnels, cable wells, pipe external waterproofing
, ground construction: bathrooms, kitchens, roof gardens, reservoirs
, joints: expansion joints, construction joints, settlement joints, wall pipes, falling water mouth.
5. Instructions for use:
Requirements for the base layer: The base layer must be clean, free of sand, loose, and hollow. The moisture content of the base layer should be within the range. The moisture content of the waterproof base layer of ground and underground buildings At the inner construction level, one vent hole per square meter should be provided.
. Material usage: generally .kg per square meter, thickness .mm. The scraping should be uniform in batches, and the up and down scraping directions should be crosswise. The interval between each time depends on the construction environment and the degree of curing of the coating film. It is generally no less than an hour and is subject to a non-stick feel. According to the design requirements, one or more layers can also be applied.
. Coating film protection: In order to extend the service life of the waterproof layer and ensure the quality of the project, it is recommended to make a protective layer after the coating construction is completed. On the roof: Make a protective layer of cement mortar on top of the coating film.
6. Precautions:
. The coating film must not be exposed to rain before it is cured, and it is prohibited for people to walk or perform other operations
. During construction, contact with open flames and water is strictly prohibited
. The shelf life is months at room temperature (C).
Request for quotation
A total of0articles  Related Comments: